Zaytoun Theme Park.
Apr 13, 2006, 07:44 PM
downloading video now. fyi: download speed is at a low of 6kbs.
Apr 13, 2006, 08:46 PM
Small update on the construction of Zaytoun Theme Park.
A small lake has been added to the park, The main path leading from main street has been exstended to reach Xtreame coaster.
The bridge for the railway has been exstended over the lake.
1) Exstended bridge:
2) Exstended path:
3) Overveiw:
Comments and suggestions welcome.
Updates coming soon
SA Productions.
A small lake has been added to the park, The main path leading from main street has been exstended to reach Xtreame coaster.
The bridge for the railway has been exstended over the lake.
1) Exstended bridge:
2) Exstended path:
3) Overveiw:
Comments and suggestions welcome.
Updates coming soon
SA Productions.
Apr 13, 2006, 11:32 PM
I like that logo! You are so good at making those. The use of arches in your park amazes me. I give an A+!
Apr 14, 2006, 03:15 AM
I really like how this park is going....it looks really fresh, what i would suggest for your Stratocoaster, use Hersheys Stormrunner instead, you get more track pieces with it, and you can do better Bunny Hills.I would say to try and to redo the supports, Start from the TOP, keep the frames consistent all the way down to the bottom, putting gantry platforms across every few.The colour scheme you used is Brilliant, so if you can incorporate all this into it, boy will it look awesome.If you need a reference, look at the one ive done in the Medway.Im not saying this is how it should be done, but it can give you ideas.Keep us posted and im looking forward to hopefully seeing the re-vamped coaster......what you calling it by the way.
Apr 14, 2006, 03:39 AM
The coaster looks fantastic. The Scenery you have used makes the coaster look evan better.
Apr 14, 2006, 07:05 AM
i really love this park, the detail is overwelming lol
Apr 14, 2006, 07:37 PM
Why havent i looked at this thread earlier - this is EXCELLENT!
Looking forward to even more updates
Looking forward to even more updates
Apr 14, 2006, 11:58 PM
Gyro construction begins.....
1) Foundations have been layed.....
2) Entrance and exit buildings have been constructed.....
3) The new sign and sceanery peaices have been added.....
4) Speaker system, storage lockers and lights have been added.....
5) Control room has been constructed.....
6) Post detailing.....
7) Overview of the construction so far.....
Hope you have enjoyed the update, Another one coming your way soon
Comments and suggestions welcome
SA Productions.
1) Foundations have been layed.....
2) Entrance and exit buildings have been constructed.....
3) The new sign and sceanery peaices have been added.....
4) Speaker system, storage lockers and lights have been added.....
5) Control room has been constructed.....
6) Post detailing.....
7) Overview of the construction so far.....
Hope you have enjoyed the update, Another one coming your way soon
Comments and suggestions welcome
SA Productions.
Users browsing this thread: 3 Guest(s)
Advertisement