Oct 21, 2012, 06:41 PM
Jacob Lehman Chief Mechanic
The boss cancelled the restaurant project. He says he wants to break in the new Tilt-A-Whirl. Apparently we have to work on the building during the season. He's a fool if he thinks that's happening.
Me and my crew finally got the new Tilt-A-Whirl ride installed, we met our deadline at the very last minute.
It's going to be a nightmare removing that wood, the nails go deep into the wall.
With summer coming and us being in lower Maryland, the summer will be tedious. I hope the construction crew can pull through.
This will not be an easy 6 years. The boss even talked about explosives to bring down the wine cellar. I just don't see that happening. Especially with the gift shop right next door. I don't even like to think about that.
The boss cancelled the restaurant project. He says he wants to break in the new Tilt-A-Whirl. Apparently we have to work on the building during the season. He's a fool if he thinks that's happening.
Me and my crew finally got the new Tilt-A-Whirl ride installed, we met our deadline at the very last minute.
It's going to be a nightmare removing that wood, the nails go deep into the wall.
With summer coming and us being in lower Maryland, the summer will be tedious. I hope the construction crew can pull through.
This will not be an easy 6 years. The boss even talked about explosives to bring down the wine cellar. I just don't see that happening. Especially with the gift shop right next door. I don't even like to think about that.